Metal roofing
Architectural shingles
Tile roofing
GAF
Owens Corning
Flat & low-slopeFree roof inspection with deck photos before we talk money - GAF and Owens Corning certified installation
Styles & brands we work with






See the difference
Before
After
Before
After
Before
AfterFull Roof Replacement in Tampa, FL
A full roof replacement in Tampa typically costs between $8,500 and $16,500 for a standard asphalt shingle roof on a 1,500 to 2,200 square foot home, and most jobs are completed in one to three days once materials are on site. The final number depends on the size of your roof, the material grade you choose, and what we find when the old roof comes off. At Brennan Roofing Co Tampa, you get that number in writing before any work starts, and it does not move at the door.
Brennan Roofing Co Tampa handles full replacements as the core of our Roof Replacement & Installation in Tampa work. We’re led by Travis Oakley, and we operate under the Garrison Standard: background-checked, uniformed technicians, a written price on paper before work begins, and a 365-Day Done Right Promise in writing on every job. If you’re weighing a full replacement against repeated repairs, call (850) 750-9193 and we’ll give you a straight answer on what your roof actually needs. Put another way: this page exists for the moment you’ve stopped patching and started planning. That calculus is personal – age of the roof, your long-term plans for the house, what past storms have done to the decking. By the time you finish reading, you’ll know the going rate in Tampa, the signs that patchwork is no longer enough, the steps between contract and cleanup, and the questions worth asking any roofer before you sign.
When You Need Full Roof Replacement
Not every roof problem justifies a full replacement. Some issues are contained – a torn section of flashing, a handful of damaged shingles, a small leak around a vent pipe. A full replacement becomes the better financial decision when the failures are distributed across the whole roof and repairs start resembling a mortgage on a dying asset. Here are the signs we see most often in Tampa homes:
- Shingle granule loss across large sections. Run your hand over a shingle and you’ll feel the gritty surface wearing away. In Tampa’s heat and UV, asphalt shingles shed granules steadily after year 12 or 14, and once the fiberglass mat is exposed, the shingle is structurally done. Granules in your gutters after every rain are the tell.
- Curling, cracked, or lifting shingles in multiple areas. A few curled shingles near a ridge vent is one thing. Curling across three or four roof planes says the shingle has lost its flexibility and is at the end of its service life. Tampa’s wet-dry-wet humidity cycle accelerates this faster than most northern climates.
- Daylight or water staining in the attic. If you can see light coming through the roof deck from inside the attic, the roof is no longer a weather barrier. Same for dark stains on the decking, which mean water has been getting through the underlayment and sitting against the wood.
- Leaks that return after patchwork repairs. Some homeowners in Carrollwood and Westchase tell us they’ve had the same leak “fixed” three or four times. At that point the damage is structural – the underlayment is compromised, and water is traveling under intact-looking shingles.
- Your roof is over 15 years old and you’re planning to stay. A 15-year-old Tampa roof has survived 15 hurricane seasons, 15 humid summers, and thousands of hours of direct UV. Some three-tab shingles are done at 12 years. If you’re staying in the house for another decade, replacing now locks in today’s material and labor prices.
- Moss, algae, or standing water that keeps returning. The classic Tampa black streak on the north-facing slope is algae, which is cosmetic early on. But heavy moss on a low-slope section holds moisture against the shingle, and moisture is what rots decking. If you’ve cleaned it twice and it’s back, the shingle has become porous.
The common thread in all six: the failures are not isolated. They’re system-wide. When we inspect a roof and find three of these conditions in a walk-through, replacement is usually the honest answer, not the upsell.
Our Full Roof Replacement Process
Here is exactly how a full roof replacement proceeds with Brennan Roofing Co Tampa, step by step. No one is guessing at the door. The sequence is the same for a Davis Islands bungalow or a New Tampa two-story, and you’ll know what happens before, during, and after the tear-off.
- Inspection and written estimate. Travis Oakley or one of our lead technicians walks the roof, photographs the problem areas, and assesses the decking as far as it’s visible. Then we write the price on paper. That number includes materials, labor, dump fees, and a line item for any decking replacement if we find rot. You sign it or you don’t. The price does not change when we start.
- Material selection and delivery. We’ll walk you through shingle lines from IKO, Atlas, or Tamko – the architectural lines that hold up in Florida’s wind and rain – and you choose with plain-English guidance on warranty, wind rating, and cost. Materials are ordered once you sign, and we coordinate delivery for the day before tear-off so the roof is never exposed overnight.
- Tear-off and deck inspection. The old shingles, underlayment, and drip edge come off. This is when we see the decking fully. If boards are soft or delaminated from past leaks, we replace them. The estimate already priced the labor for this at a per-sheet rate, so there is no surprise invoice at the end.
- Underlayment and water barrier installation. In Tampa’s climate, the underlayment matters as much as the shingle. We install a synthetic underlayment rated for high heat and moisture, lap the seams correctly, and seal around penetrations like vents, skylights, and pipe collars before any shingle goes down.
- Shingle installation and flashing. Shingles go on course by course, nailed to manufacturer spec so the wind warranty holds. Flashing is replaced at every transition: chimney bases, valley lines, roof-to-wall intersections, and drip edges. This is where a second-rate crew fails and a disciplined one holds. Flashing is thin metal that directs water away from transitions; when it’s bent, rusted, or reused from an old roof, leaks start within a season.
- Cleanup and final inspection. We magnet-sweep the yard for nails, haul the dumpster, and walk the roof with you before the crew leaves. Then the 365-Day Done Right Promise goes into effect: if anything fails within a year, we return and fix it at no charge. No fine print, no restocking fee, no “that’s normal wear.”
Expect the whole process, from signed contract to final walk-through, to run five to ten days for most Tampa homes. Weather in the summer afternoons can interrupt a shingle crew for a few hours, but the roof is always dried in by the end of each workday.
Full Roof Replacement Pricing in Tampa
We give pricing up front because homeowners should not have to call just to learn the ballpark. Then you call only when you’re ready for an exact number, which takes an inspection and takes about an hour of your time.
What follows are the ranges we’ve written on actual Tampa replacement contracts, not national averages from a roofing blog. Every figure assumes tear-off and haul-away of the old roof, standard architectural shingles, synthetic underlayment, new drip edge, and a normal two-story or single-story roofline without unusual angles. Homes with multiple mansards, roof decks, or cathedral sections run higher.
| Roof Type | Typical Tampa Price Range | What You’re Paying For |
|---|---|---|
| Architectural asphalt shingle (standard) | $8,500 – $12,500 | Most common choice. 25-30 year material lifespan in Tampa conditions, wind-rated for 110-130 mph depending on grade. |
| Architectural asphalt shingle (large home, 2,500+ sq ft) | $12,500 – $16,500 | More squares of material, more labor days, often a more complex roofline. |
| Standing seam metal roof | $18,000 – $32,000 | Higher material cost, different installation trade, longer lifespan and stronger wind performance in hurricanes. |
| Tile or Boral concrete tile | $22,000 – $38,000 | Heavier structural requirements, specialized underlayment, higher labor cost. Often seen in South Tampa and Bayshore-area homes. |
What changes the price inside these ranges: roof pitch, number of valleys and hips, whether the decking needs widespread replacement, and whether the home requires a re-deck to meet current code after a tear-off. Any roofer who tells you a single number before inspecting is guessing. Ours is a real range, and when Travis inspects, you’ll get a number on paper for the specific house.
A few things worth knowing about Tampa-specific costs. Your old roof is underlay by a previous generation of shingle that often predates the 2007 Florida Building Code wind-uplift requirements. If you’re replacing now, the code compliance upgrade is part of the job, not an add-on. And if your home is in a flood zone or the City of Tampa historic district, the materials and elevations may be regulated by the local building department. We handle the permitting and know the local code path.
Estimates are free. Call (850) 750-9193 to schedule the inspection and walk the roof with us.
How to Assess Any Roof Replacement Quote in Tampa
Whether you hire Brennan or someone else, ask the same five questions of every roofer who walks the roof. How they answer, in writing, tells you everything you need to know.
One: what underlayment will you use, by brand name, and will it be on the proposal as a line item? The underlayment is the waterproofing layer under the shingle. In Tampa’s rain, it is what protects the decking when wind-driven water gets under a shingle edge. If a quote just says “felt,” you’re getting an old-school product that fails early in humid conditions. We use synthetic and we’ll name the manufacturer and the grade.
Two: will the decking be inspected after the tear-off, and what is your per-sheet replacement cost? Decking is the plywood or OSB substrate the shingles nail into. When it’s soft or delaminated from old leaks, it cannot hold a nail the same way. We include decking replacement in the written estimate at a stated per-sheet price, so if we find rot on the back side of the roof, you already know the cost. A contractor who can’t answer this before the job starts will name the price after – and that is exactly the moment you lose leverage.
Three: how do you detail the flashing, specifically at the chimney, the valley lines, and the drip edge? Flashing is the metal work that channels water away from the roof’s joints and seams. When it’s done wrong, leaks start in the first six months. When it’s reused from the old roof, it fails even sooner. The written estimate should list new flashing as a line item, not “as needed.”
Four: what is your wind rating and does my shingle warranty cover wind in Tampa? Every shingle carries a wind rating – 110, 130, 150 mph. Insurance carriers in Florida care about this number. We install using manufacturer-recommended nailing patterns so the wind warranty holds. If the installer does not follow the pattern, the manufacturer can void the warranty. Ask the roofer to state, in writing, that they follow the manufacturer’s installation spec to maintain the warranty.
Five: will you put the total price on paper before any work starts and is that number fixed? A disciplined contractor says yes without hesitation. That’s the whole point of the Garrison Standard at Brennan Roofing Co Tampa – written price before any work begins, no price movement at the door, and a one-year written guarantee behind the whole job. Call (850) 750-9193 and ask for Travis Oakley. You’ll get an inspection and the written number within a week.
Permitting and Code in Tampa
A full roof replacement in Tampa is a permitted job. The contract should include pulling the permit as a standard part of the work, not as an extra fee at the end. The permit triggers the building-department inspection, which is separate from our own final walk-through. It’s the city’s way of confirming the nailing pattern, underlayment, and flashing meet the Florida Building Code. If a roofer suggests doing the job without the permit, thank them for their time and call someone else – the liability sits with the homeowner when it’s done that way.
The Florida Building Code, updated after the 2004 and 2005 hurricane seasons, requires specific underlayment standards and nailing patterns in high-wind regions. It also requires a roof-to-wall attachment screening if the house is older and the framing is being inspected for the first time. This is why a full replacement costs what it costs – the code has teeth, and doing it right takes labor and disciplined sequencing.
Material Choices: What We Carry and Why
Our installs draw primarily from architectural shingle lines we’ve seen hold up in Florida’s climate. Each manufacturer we specify has a place in our lineup, and Travis will explain the tradeoffs honestly.
IKO makes architectural shingles with a heavy base mat and strong wind-uplift ratings. We use their Cambridge line on homes where the owner wants a premium dimensional look without the premium of laminate. Atlas is known for shingles with high reflectivity options that she talks about for Tampa’s cooling loads. Their StormMaster line carries a 150 mph wind rating, which matters for insurance paperwork. Tamko has a Heritage architectural line with a broad color selection, often chosen by homeowners in historic districts who need a specific color to match neighboring roofs.
We’ll also bring Boral into the conversation when the home is heavy-tile or requires a concrete profile for historic compatibility. Boral makes concrete tile systems that handle the color, weight, and wind requirements of South Tampa and Hyde Park homes, though the structural load means the roof must be framed for it. We’re not here to talk you into the most expensive material on the truck. We’re here to make sure you understand what you’re buying, which is why every quote lists the specific manufacturer, product line, and warranty period.
What the 365-Day Done Right Promise Actually Covers
The Promise is the written guarantee that sits behind every Brennan Roofing Co Tampa job. It’s not a marketing phrase. It’s a paragraph in the contract. Here’s what it says, in plain language: if any part of the installation fails within one full year of the completion date, we come back and fix it at no charge. That includes a leak that traces back to our flashing work, a shingle that blows off due to our nailing pattern, or a water-intrusion issue at a vent collar we reinstalled. We send technicians, we pay for the material, we do not invoice you for the second trip.
No homeowner should accept a roof without a written guarantee of this type. Most failures happen early when they happen at all – a missed nail, a bad seam, a flashing joint that was not lapped correctly. The first twelve months are when the work proves itself. We put that year on paper, and we return for free if it fails.
This is what sets The Garrison Standard apart from the bid-hunting model that dominates Tampa roofing. We’re an independent local operation led by Travis Oakley, and every technician who steps on your roof has passed a background check and shows up in uniform. You know who is on the roof because we told you their name. That is the whole point.
FAQs – Full Roof Replacement
How long does a full roof replacement take in Tampa?
Most standard asphalt shingle replacements in Tampa are completed in one to three days of installation work, with the full timeline from contract to final inspection running five to ten days once materials are coordinated. The tear-off and re-shingle for a 1,500 to 2,200 square foot home is usually a two-day job for our crew, with a third day if the decking requires widespread replacement or the roofline is complex. Weather in the summer afternoons can pause work for an hour or two, but the roof is dried in by the end of each workday. Call (850) 750-9193 and Travis can give you a real timeline for your specific house.
Is it cheaper to repair or replace my roof?
Repair is cheaper as a one-time expense, but if your roof is failing in multiple places or is over 15 years old, repeated repairs often cost more than one replacement within three to five years. A single flashing repair might run $350 to $800, and a section of shingle replacement might be $600 to $1,200; once you’ve done three or four of those on a 15-year-old roof, you’ve spent the down payment on a full replacement. If the decking is already compromised from old leaks, repair is not an option at all. Call (850) 750-9193 for a straight answer on which one your roof needs.
Can you replace my roof the same week I call?
We can often start within five to ten business days of the signed contract, and we’ll confirm the exact start date in writing before you commit. Emergency or storm-damage replacements move faster when insurance is involved. Scheduling depends on material lead time and current crew load, but we never overbook crews to the point of no-showing a start date. If we put a date on paper, we’re there that day.
Do I need to be home during the replacement?
No, you do not need to be home during the tear-off and shingle installation, though we’ll do a final walk-through with you when the work is done. Many Tampa homeowners leave for work and come back to a completed roof. We communicate by phone or text with photos of any decking issues we find mid-job so you’re never surprised at the end. The final inspection happens on your schedule.
What does a full roof replacement cost per square foot in Tampa?
In Tampa, full architectural shingle replacements generally run $3.50 to $5.50 per square foot depending on the roof pitch, complexity, and material grade, while standing seam metal runs $7.00 to $10.00 per square foot. That includes all labor, tear-off, hauling, underlayment, and flashing work. The actual number for your home depends on the roof’s footprint and the material you choose. Call (850) 750-9193 for an exact written estimate, free of charge.
Written by Travis Oakley, Owner at Brennan Roofing Co Tampa, serving Tampa.